人人看片人人看特色大片,国产曰批免费视频播放免费,99热在线精品免费全部my,日韩精品国产另类专区,欧美日韩免费专区在线

Carbon Dioxide Compressor Series A and Series B Successfully Commission in Xinjiang Group’s Purification Workshop

來(lái)源: xinjiang
編輯: 阿勇
發(fā)布時(shí)間: 2013-06-26
訪問(wèn)量: 4419

Xingjiang- On June 21, the carbon dioxide compression section of Xinjiang Group’s Purification Workshop officially commissioned, sending first flow of air for the coal gas of gasification furnace of purification workshop. 
    To ensure the success of one-time commissioning, workshop leaders deployed tasks in advance and organized employees to re-fasten each bolt at each flange connection part, purge nitrogen pipelines, clean equipment and check and eliminate safety hazards. During commissioning, workshop leaders and professional workers had a whole-process tracking of the commissioning link, strengthened central control analysis, strictly controlled process indicators, coordinated and solved emerging problems, making the entire commissioning process in order and each process indicator up to standard. One-time commissioning was successfully achieved.
    The success of carbon dioxide compression lays a solid foundation for the overall commissioning of purification workshop.